2012年8月12日星期日

Laying of Engineered Wood Flooring Yourself

Step 1: Assemble the materials you’ll need You will need:Tape measureBroom and dust pan Moisture barrier (If laying on concrete sub floor) PadAdhesive (If your wood is tongue-and-groove) SawRubber malletTapping block

Step 2:Determine how much wood you'll need Measure the dimensions of the room you want to lay the flooring using your tape measure. Multiply the length of the room with its width to get the room’s exact square footage.  Add about 15 per cent to the room’s square footage to get the actual size of wood you will need. 15 per cent extra footage is added to cater for cutting mistakes and waste during installation. Ecological Composite Wood.

Step 3:Clean the floor Remove everything in the room to allow for thorough cleaning before laying the floor. Sweep and mop the floor to get rid of all visible dart particles and debris. 

Step 4:Install a moisture barrier If your sub-floor is concrete, cover it with a moisture barrier to prevent ground moisture damaging your wood flooring. Fit the pad on top of the moisture barrier once the barrier is in place.

Step 5:Lay the flooring Lay down the first flooring board starting from the furthest corner of the room. Lock the next flooring board into place, if the wood has a snap-lock feature.  Apply adhesive at the first and second boards’ point of contact to hold the boards together, if your wood is the tongue-and-groove type.  Repeat the process and lay a complete vertical row first. Measure the last board at the end of the row and cut it to the exact fit against the wall. Use your rubber mallet to fit the board perfectly against the wall. Composite Timber Floor Suppliers.

Add a second row to the side of your first vertical row and work your way to the end of this row. Add another row to the side of the second row and repeat this working pattern with subsequent rows until you’ve laid out the whole room. 

Arrange the rows in a systematic order from where previous rows start to ensure the end joints will look beautiful when the job is done. Finally, attach baseboards around the floor and wall joints to complete laying your flooring. Composite Wood Floors Producers.

Step 6:Clean Up Pick up anything laying around on the floor. Sweep saw dust and other debris away and mop any visible dirt on the new flooring to finish a job well done. 

没有评论:

发表评论