2015年3月1日星期日

Careful construction - floor waxing maintenance considerations

 

Floor waxing, shake container fitted under the floor wax and stir evenly. With a clean cloth or sponge dipped full floor wax, so as not to drip as the standard. Shake and stir evenly floor wax, can not striking at the first partial trial, after confirming that no abnormal overall waxing. Then with a clean cloth or dust mop fully dedicated dipping wax wood floor wax, according to the direction of the wood grain flooring carefully applied, the speed is not too fast, do not leak coated or uneven thickness, keep Bohou uniform.

Floor waxing polishing, generally adopt the way to play it twice, after the first pass kick, then whisk again wax. Every time you must wait waxing layer of wax is dry to the upper and lower layer of wax, with fine sandpaper or a soft cloth polishing surface until completely dry. Floor waxing is not an easy living, usually best left to professionals do. If you want to do it themselves, then we should pay attention to some of the construction details, in order to prevent the final result is not satisfactory.What is the best composite outdoor stairs

Waxing the floors need to be repeated from the wax, if the home's floor using a long time, has played several times wax, then before re-waxing, you need to first layer of wax on the floor to clean out the original. Generally need to use the wax surface cleaners, use the time to note the correct operation, in order to prevent damage to the floor cleaner.

Should pay attention to safety using a floor wax, floor wax is flammable and explosive dangerous goods, in the waxing process, floor wax becomes solid volatiles attached to the floor, then gradually increase the volatile matter content in the air, the big to the extent that in case of fire flammable. So when the window ventilation to the floor waxing, floor wax, so the concentration of chemicals will reduce evaporate without causing harm. Do not smoke while waxing places, try not require the use of gas and other electrical equipment. Composite deck tiles over existing wood deck

Protect the baseboard and furniture, in order to prevent contamination of the baseboard and floor wax, furniture, before waxing can be removed furniture, paper covered with tape baseboard and so on. Until after the floor wax to dry, then its recovery.

Floor waxing precautions when waxing the floor, be careful not to wax the floor directly on the floor, doing so is easy to make the corresponding parts appear difficult to spend the floor marks. In addition, waxing, should be taken to avoid mixing gravel and other sharp objects into the floor wax, thus causing damage to the floor. Throughout the construction process, you need to be careful not to damage the floor itself.

 

After floor maintenance, floor waxing After waxing, should pay attention to stay out of the drying time, usually about 1 hour. Before the floor wax dry, do not walk on the floor. After the floor waxing, but also require frequent cleaning to remove dust on the floor. Composite wood directly on concrete stairs

没有评论:

发表评论